Concrete

You can tell by the long shadows that the picture below was taken late in the day (4:30pm today to be exact). Our crossover has now been poured. It looks as though it was their last one of the day on Friday. The boxing is still in place. The crossover for Lot 31 is yet to be poured and the footpath stops about halfway across our frontage.

At the northern end of Red Brush Rd where the crossovers were complete last week there have been earthworks to level out the nature strips and land lots. I believe this will need to be done on our lot before the site survey can be undertaken.