Site start was booked in for Thursday December 3. Sure
enough, when I checked this morning, there had been developments. The temporary
fence in in place, a dumpster has been positioned on the nature strip, a site
scrape has been performed and a portable toilet has appeared. I wonder if the
brand name of the portable is designed to instruct its users.
Solsbury Field is now abuzz with building activity happening on many blocks on the eastern side of the estate.
No comments:
Post a Comment