Wednesday 4 November 2015

Our Plan

In this current hiatus while the building materials are ordered and a site start is set, I thought take look at our house plan, The plan for our house as documented in the building contract is shown below below:



It really is the standard Balwyn 196 design with a few minor tweaks.
These are :

  • The ensuite has been extended 300mm into Bedroom 1 to accommodate a wider shower and provide extra room to manoeuvre a wheelchair.
  • A wider shower in the en suite with a curtain rather than a door – to make entry and transfer from a wheelchair easier.
  • A door between the family/kitchen area and the entranceway and a sliding door between the family/kitchen area and the rear passageway. This is to allow us create a closed off area of suitable size for the air-conditioner in the family room to cool.
  • Wider doors to Bed1, the Garage, the Laundry, and the two new doorways to the family/kitchen area and the toilet.
  • Toilet door opening outward.

No comments:

Post a Comment