Wednesday 16 December 2015

All in Readiness for the Pour

You can see from the picture below, taken this afternoon, all is readiness for the slab pour, scheduled for tomorrow. The waffle pods are in place, along with the re-inforcing steel. The 2 layers of edge formwork for the concrete are also complete. The maximum temperature forecast for tomorrow is 33 degrees. It will be important to ensure that the concrete does not lose too much moisture before it is properly cured.


No comments:

Post a Comment