Monday 7 December 2015

Site Start !

Site start was booked in for Thursday December 3. Sure enough, when I checked this morning, there had been developments. The temporary fence in in place, a dumpster has been positioned on the nature strip, a site scrape has been performed and a portable toilet has appeared. I wonder if the brand name of the portable is designed to instruct its users.



Solsbury Field is now abuzz with building activity happening on many blocks on the eastern side of the estate.

No comments:

Post a Comment